Campus construction in Gorham
The university campus in Gorham runs housing, athletic and utility projects through the summer while students are away. A Gorham campus job has a hard August finish, so trades stack up and the head count climbs fast. Gorham campus sets go behind site fencing near the service drives rather than on the quad lawns. Because the Gorham campus roads stay open all year, service continues right through the winter term. Move-in weekend in Gorham brings a short burst of orders for the parking lots and the residence halls. Gorham athletic events on the campus fields then take weekend sets through the fall.
Subdivision building around the Gorham villages
Fields between Gorham Village, Little Falls and White Rock have been filling with new streets of houses for years. A Gorham subdivision keeps two or three units spread along the road as the framing advances. Gorham builders want the units where a pump truck can reach them without driving onto a fresh binder course. Clay under the Gorham fields holds water, so the pads stay in place until the drives are paved. Gorham crews work through the winter on those sites as long as the roads are plowed. Frost heave in Gorham will cant a unit over a cold month, so level gets rechecked.
Bypass and road crews in Gorham
The Route 25 corridor and the bypass work give Gorham a long run of paving, drainage and signal projects. A Gorham roadwork unit moves along the corridor every few days with the work zone. Gorham crews need a paved shoulder wide enough for the service truck to stop clear of traffic. Utility digging in the Gorham clay leaves everyone filthy, so a handwashing station goes with the set. Gorham night paving means the service call lands early before the commuter traffic builds.
